Two Efficient Methods of Detailing & Placing Reinforcement

• Main Steel in T8, T10, T12, T14 & T16
• Alternate bar diameter mix (either next dia. up or down)
• Variable centres to suit required area of Steel (100mm min)
• Staggered bars re: Lapping & Curtailment
• Place like loose bar in B1, B2, T2 & T1 layers
• End Splices means no congestion at laps
• Ideal when detailing two way spanning structural slabs

• Main steel in T8, T10, T12, T14 & T16
• Distribution steel in T8, T10 & T12
• Alternate bar diameter mix (main steel only)
• Variable centres to suit required area of steel (for both main & distribution bars)
• Variable alternate bar lengths (main steel only)
• End & side splices means no congestion at laps
• Ideal when detailing one way spanning structural slabs.
All to BS4483 or BS7123 in Type 2 wire
*Contact ROM Design team for detailing ideas
Make
an enquiry
Email this item
Print this page

Related Products: